WastePlant
Energy from waste Operating

Kwinana Energy Recovery

Kwinana, Australia

ACCIONA owns and operates this waste-to-energy facility in Kwinana, south of Perth in Western Australia. The facility is designed to process up to 460,000 tonnes of non-recyclable waste a year. The operator also describes metals recovery from bottom ash.

Published capacity
460,000 t/year
Operator
ACCIONA
Carbon capture
Unknown

Location

Kwinana, Western Australia, Australia

The registry pin marks an approximate city or district location.

Look up the area on OpenStreetMap ↗

Technical specifications

Annual capacity
460,000 t/year
Design · Operator-published annual facility capacity for residual non-recyclable waste Source 1 Source 2
Grid connection
Unreported
Net efficiency
Unreported
Net electricity
Unreported
District heat
Unreported
Renewable natural gas
Unreported
Biochar
Unreported
Design CO₂ capture
Unreported
Feedstock
Municipal solid waste
Outputs
Electricity, Recovered recyclables
Capital cost
Unreported
Annual operating cost
Unreported

Environmental footprint

GHG intensity
Unreported
Fly ash diversion
Unreported

Supply chain and compliance

  • No published supply chain or policy links.

Sources and methodology

Record updated